• Certified Company

    ISO 9001:2005

  • Top Most Factory

    In Saudi Arabia

Talk to Our Officers

966557203021

Installation Services

Installation Services
  • Precision fabrication and erection of stainless steel (SS) and carbon steel (CS) pipelines across industrial facilities in Saudi Arabia — including pipe alignment, fit-up, spool installation, and field routing as per approved isometric drawings and P&IDs
  • Certified welding services using GTAW (TIG), SMAW (Stick), and FCAW processes — performed by qualified welders with full adherence to ASME B31.3, ASME IX, and ASTM standards for process piping in oil, gas, and petrochemical plants in KSA
  • Integration of pipelines with process equipment, valves, and instrumentation — including nozzle connections, tie-ins, control valve stations, flow meter installations, and instrument hook-up in compliance with engineering design specifications
  • Support structure design and implementation including pipe hangers, clamps, guides, anchors, and spring supports — fabricated and installed as per ASME B31.3 and project-specific stress analysis requirements to ensure long-term pipeline stability
  • Installation of duplex, super duplex, and alloy piping systems for high-pressure, high-temperature, and corrosive service applications — with strict material traceability, controlled welding procedures, and full PMI (Positive Material Identification) verification
  • Underground and aboveground pipeline installation services in Saudi Arabia — including trench excavation, pipe bedding, coating inspection, backfilling, and reinstatement as per project specifications and local regulatory requirements
  • Flange bolt torquing and joint assembly services — performed using calibrated hydraulic torque tools as per ASME PCC-1 guidelines to ensure leak-free flange connections in high-pressure and critical service pipelines
  • Weld inspection and NDT verification of all installed pipelines — including radiographic testing (RT), ultrasonic testing (UT), and dye penetrant inspection (DPI) to ensure 100% weld quality before system handover
  • Valve and actuator installation services for gate valves, globe valves, ball valves, butterfly valves, and control valves — including alignment, bolting, actuator mounting, and functional testing to confirm correct operation
  • Insulation and cladding installation for hot and cold service pipelines — using approved insulation materials and aluminum or stainless steel cladding to maintain thermal efficiency and protect against external corrosion in KSA industrial environments
  • Skid and module piping installation for packaged process units — including pre-fabricated spool erection, inter-connecting piping, utility connections, and final hook-up to achieve mechanical completion on schedule
  • Full QA/QC documentation and as-built records for all installation works — including weld logs, material certificates, inspection test plans (ITP), punch list closeout, and final handover dossiers in compliance with ISO 9001 and client specifications